by armourvalvedev | Nov 30, 2018 | Case Studies, Oil and Gas
Problem: A Canadian oil sands mining and upgrading facility was using globe valves on 8, six-inch injection lines to throttle and control the injection of flocculent to a thickener tank below. Due to the persistently erosive nature of the line media that would destroy...
by Core Marketing | May 19, 2022 | Case Studies, Chemical/Petrochemical
Issue & Importance A Canadian methanol producer was using a line blocking system designed when the plant was originally built in the 1970s. At least two workers were required to spread the pipe at a flange in order to put the blocking system in place. When the...
by armourvalvedev | Dec 12, 2022 | Case Studies, Industrial Processes
Issue & Importance A steel plant installed two new boilers and a cogeneration facility for redundancy within their system. The boilers were designed to run on natural gas, as well as a blend of coke oven gas, blast furnace gas, and natural gas. When plant...