Problem: A Canadian oil sands mining and upgrading facility was using globe valves on 8, six-inch injection lines to throttle and control the injection of flocculent to a thickener tank below. Due to the persistently erosive nature of the line media that would destroy...
Issue & Importance A Canadian methanol producer was using a line blocking system designed when the plant was originally built in the 1970s. At least two workers were required to spread the pipe at a flange in order to put the blocking system in place. When the...
Issue & Importance A steel plant installed two new boilers and a cogeneration facility for redundancy within their system. The boilers were designed to run on natural gas, as well as a blend of coke oven gas, blast furnace gas, and natural gas. When plant...
I am a mechanical engineer with 30 years of plant, sales and service experience. I have been on both sides of the desk and can relate with you when issues arise in the plant. You can trust that I won’t recommend a product unless I know that it will do the job for you.
Marc Soucy, P.Eng
Directeur National des Ventes
J’ai un diplôme en génie mécanique avec 30 ans d’expérience dans les usines, les ventes, et le service. J’ai été de chaque côté du bureau et je comprends lorsque des problèmes font surface dans l’usine, l’importance que l’on doit y apporter. Vous pouvez être sûr que je ne recommanderai pas un produit à moins que je sache qu’il convient à votre application.