by armourvalvedev | Mar 1, 2021 | Case Studies, District Energy
Issue & Importance A campus district energy system was planning a small but challenging piping project. The expansion of a 3″ hot water line was complicated by a limited utility corridor, many horizontal bends, and the construction timeline of the new...
by Core Marketing | May 19, 2022 | Case Studies, Chemical/Petrochemical
Issue & Importance A Canadian methanol producer was using a line blocking system designed when the plant was originally built in the 1970s. At least two workers were required to spread the pipe at a flange in order to put the blocking system in place. When the...
by armourvalvedev | Dec 12, 2022 | Case Studies, Industrial Processes
Issue & Importance A steel plant installed two new boilers and a cogeneration facility for redundancy within their system. The boilers were designed to run on natural gas, as well as a blend of coke oven gas, blast furnace gas, and natural gas. When plant...
by armourvalvedev | Dec 7, 2023 | Case Studies, District Energy
Issue & Importance A district energy utility needed to connect a new building to an existing hot water main for heating and domestic hot water. The project would require 150 feet of direct buried 2” hot water service piping to be installed around existing...