by armourvalvedev | Apr 9, 2019 | Case Studies, District Energy
Problem In order to control energy costs, a municipal building was to be connected to an existing district heating system prior to the building starting construction. To complete the connection, the local utility company would have to run two 6-inch district heating...
by armourvalvedev | Mar 1, 2021 | Case Studies, District Energy
Issue & Importance A campus district energy system was planning a small but challenging piping project. The expansion of a 3″ hot water line was complicated by a limited utility corridor, many horizontal bends, and the construction timeline of the new...